Welcome to Würth Belux Only for professionals

2-component primer filler Multi-Fill

Primer filler, 2C Multi-Fill
PRIM-2K-MULTIFILL-400ML

Art.-no. 08932131
EAN 4046777463736

Prices for customers after login

Show availability in Würth trade store
Exclusively for trade customers

Register now and access more than 125,000 products

2-component epoxy primer filler for optimum application safety on all metals, anodised surfaces and GFRP.

Optimal adhesion and corrosion protection properties on bare sheet metal



Excellent insulating action



Can be filled



Long application time


Approx. 4 days at 20°C



Can be covered wet-on-wet


No intermediate sanding once smoothed to a matt finish

Notice

Cannot be used over acid primers. In conjunction with PE spray filler, it is essential that the drying times are observed. After use, turn the can upside down and spray until the valve is empty. Only to be used by skilled professionals.

Product information

Datasheets(X)

Certificates/ Documents

 | 

 | 

Application area

Spot repair and painting parts



Surfaces:


  • Bare sheet steel

  • Zinc-plated sheet steel

  • Aluminium, anodised aluminium

  • UP filler

  • Old paints

  • GRFP materials: Do not use 2-component Multi-Fill with acid primers.
Instructions

The surface must be clean, dry and free from grease. Lightly sand problematic surfaces. Shake the can vigorously for 2 minutes before spraying. Take the push button (red) out of the cover cap, place on the pin on the base of the can and activate by pressing. Remove the push button and dispose of it. Shake the can vigorously again after spraying. Apply 2-3 spray coatings (70 µm) at a distance of 20-30 cm. Observe the intermediate flash-off time (5-15 minutes). Can be painted over with all common top-coat systems.



Drying times


  • Air drying: 24 hours/20°C

  • IR drying: 70 minutes/60°C

  • Oven drying: 30 minutes/60°C

Contents

400 ml

Chemical basis

Epoxy resin

Colour

Beige

Drying time

24 h

Processing time

4 d

Conditions for drying time

at 20°C

Min. flash-off time

10 min

Max. coating thickness

70 µm

Max. temperature resistance

80 °C

Min. spraying distance

20 cm

Max. short-term temperature resistance

120 °C

Min. processing temperature

20 °C

Max. spraying distance

30 cm

Shelf life from production

24 Month

Suitable glove:
 
Product
Description
Nitrile chemical protective glove With cotton velour finish inside
Nitrile chemical protective glove With cotton velour finish inside
Description:
Permeation level: 5
Nitrile chemical protective glove Long, heavy-duty design
Nitrile chemical protective glove Long, heavy-duty design
Description:
Permeation level: 6
Permeation is the process by which a chemical moves through the material of a protective glove on a molecular level. The time from the initial contact between the chemical and the glove to the permeation of the material is the breakthrough time.
Measured breakthrough time
Permeation level
< 10 min
0
≥ 10 min
1
≥ 30 min
2
≥ 60 min
3
≥ 120 min
4
≥ 240 min
5
≥ 480 min
6

Important information:

The information given is based on experience and laboratory conditions and is designed as a guide. However, the actual suitability of a glove depends on the individual conditions of its use and must be confirmed by an appropriate test under operational conditions. Given the variety of materials and chemicals used, the possibility of incompatibility or usage problems for the wearer cannot be excluded in individual cases. We would be happy to advise you about optimum solutions.

Art.-no.
Cust. Mat. No.

Hazardous Material

Product information

Datasheets()

Datasheets ()

CAD data  | 

Certificates/ Documents

 | 

 | 

Technical information